SE APPROVED ET AB LE By Chad FO R DO OR SW IN G MILLWORK L.C. 1554 NE 69TH PLACE - ANKENY - IA 50021 PH: 515.289.3787 - RCSMILLWORK@RCSMILLWORK.COM DOOR OPENING SEE SCHEDULE PROJECT: (E) FRAME WIDTH POLK COUNTY CRIMINAL COURTS 110 6th AVE DES MOINES, IA...
More
SE APPROVED ET AB LE By Chad FO R DO OR SW IN G MILLWORK L.C. 1554 NE 69TH PLACE - ANKENY - IA 50021 PH: 515.289.3787 - RCSMILLWORK@RCSMILLWORK.COM DOOR OPENING SEE SCHEDULE PROJECT: (E) FRAME WIDTH POLK COUNTY CRIMINAL COURTS 110 6th AVE DES MOINES, IA 50309 DRAWING: 1 PLAN @ (27) DOOR FRAMES (BB) (27) DOOR FRAMES CONTRACTOR: 27.95 SCALE : 1/2" = 1'-0" NEUMAN BROS. INC. ARCHITECT: OPN ARCHITECTS 6.19.2017 ISSUED FOR APPROVAL 3.28.18 REVISION # 2 MATERIAL LEGEND EXPOSED SW-1= QTR SAWN SOLID CHERRY. FINISH TO MATCH SAMPLE #16180-XXX 5 or 6 27.96 SW-1 1/2" DOOR STOP 3 4 SEMI-EXPOSED NOTE(S) 27.96 27.96 1. RCS TO ASSEMBLE DOOR FRAMES 2. TRIM TO BE SENT LOOSE & LONG EDGE BANDING SW-1 1" WOOD DOOR JAMB 3. ADD 1" TO BOTTOM OF SIDE JAMBS TO (F) FRAME HEIGHT SCRIBE ON SITE SEE SCHEDULE DOOR HEIGHT HARDWARE: JOB NOTES: ULEF CORE 1.75" DOOR: BY OTHERS PLAN INDEX 9.7.2018 CUSTOM DOOR OPENING MILL # 16-33 SEE SCHEDULE DRAWN (E) FRAME WIDTH C. WEISER BY ARCHITECTURAL WOODWORK P.M. C. HARPER INSTITU
Less