Application Example
In the above example, 500 TPD of unsorted MSW is processed in the high temperature
boiler/reactor, while the 15 TPD of fly ash (3% of MSW processed) is converted into the
input for construction materials. Approximately 15 TPD of...
More
Application Example
In the above example, 500 TPD of unsorted MSW is processed in the high temperature
boiler/reactor, while the 15 TPD of fly ash (3% of MSW processed) is converted into the
input for construction materials. Approximately 15 TPD of remaining capacity is available
in the PTDR system to treat other feedstocks such as hazardous or industrial waste. The
bottom ash generated (around 20% of quantity processed in the high temperature
reactor/boiler) is collected and provided and/or sold as cement aggregate.