Before and After Measurements
DB
Number
C/Breaker
Number
Before
Measurement (W)
After
Measurement (W)
Savings in
Watts
Percentage
saving
L3 5 1279 751 528 58.
71%
L3 6 1241 759 482 61.
00%
L3 7 1257 760 497 60.
00%
L2 3 1271...
More
Before and After Measurements
DB
Number
C/Breaker
Number
Before
Measurement (W)
After
Measurement (W)
Savings in
Watts
Percentage
saving
L3 5 1279 751 528 58.
71%
L3 6 1241 759 482 61.
00%
L3 7 1257 760 497 60.
00%
L2 3 1271 748 523 59.
00%
L2 31 1208 752 456 62.
21%
L2 60 1282 753 529 59.
00%
Total
Average
60.
00%
The results above reflect the outcome of the project being a success with all the predictions being
accurate in relation to the scope of the project.
Toyota Boshoku
Energy Efficient Lighting Project
Power Measurement:
The Power measurements show a definite decrease in consumption from ±420 watts to ±260 watts.
This is well within the predicted saving guarantee of 90%, with only 1-3 % allowance.
Lux Levels:
As part of the energy proposal, Magnet looks at improving the working environment of the employees
by not only increasing the Lux levels, but also improving the visual effect of their working environment.
This was
Less