Line Manager Assessment Review (See Notes 2 and 5) Review Date: Review Date: Review Date: Review Date: Name: Name: Name: Name: Rank/Grade: Rank/Grade: Rank/Grade: Rank/Grade: Signature: Signature: Signature: Signature: Notes: 1 If using a ‘Generic’ risk...
More
Line Manager Assessment Review (See Notes 2 and 5) Review Date: Review Date: Review Date: Review Date: Name: Name: Name: Name: Rank/Grade: Rank/Grade: Rank/Grade: Rank/Grade: Signature: Signature: Signature: Signature: Notes: 1 If using a ‘Generic’ risk assessment, Assessors and Line Managers are to satisfy themselves that the assessment is valid for the task and that all significant hazards have been identified and assessed. If additional hazards are identified they are to be recorded and attached to the Generic assessment. 2 Line Managers are to note that they are responsible for production of the risk assessment and that they are signing to indicate that the risk assessment is suitable and sufficient and they consider the risks to be acceptable. Common, regular or frequent High 3 3 Med 6 High 9 High occurrence. Medium Occasional occurrence. 2 2 Low 4 Med 6 High Low Rare or improbable occurrence. 1 1 Low 2 Low 3 Med 1 2 3 Minor injury or illness. Serious injury or illness. Fatalities
Less