Sustainable Stormwater Management Program, Portland Bureau of Environmental Services; Feb.
6, 2007.
1
Drainfield
Weir
Drainfield
Inlet Pipe
Beehive
Overflow
Forebay
Weir
Forebay
Design Report
Rain Garden at Glencoe Elementary School
SE 51st
and Morrison...
More
Sustainable Stormwater Management Program, Portland Bureau of Environmental Services; Feb.
6, 2007.
1
Drainfield
Weir
Drainfield
Inlet Pipe
Beehive
Overflow
Forebay
Weir
Forebay
Design Report
Rain Garden at Glencoe Elementary School
SE 51st
and Morrison
Overview
Catchment Area.
The catchment area includes
Morrison Street and SE 51st
Avenue (about 25,000
ft2
of asphalt) as well as the swale for the school
parking lot - in large storms the 10,000 ft2
parking
lot sends some drainage to the facility2
.
About
1,000 ft2
of the school driveway also contributes
runoff.
Overall Facility Contour.
The bottom of the rain
garden is flat (similar to a planter) throughout the
facility.
The planted edges have 4:1 slopes.
Forebay.
Runoff from the street and overflow from
the parking lot swale enter the forebay through a
12” pipe.
The forebay footprint is 550 ft2
.
A weir
controls the depth of ponding; runoff passes into
the main compartment when ponding reaches a
depth of 2 inches.
Main Com
Less