1
2
Rack Installation IInnssttaallllaattiioonn dduu rraacckk || RRaacckk--MMoonnttaaggee || || IInnssttaallaacciióónn ddeell rraacckk
Installing Flush-Mount or Center-Mount Static Rails (Two-Post)
NNOOTTEE: To configure your rails for a tooled flush-mount...
More
1
2
Rack Installation IInnssttaallllaattiioonn dduu rraacckk || RRaacckk--MMoonnttaaggee || || IInnssttaallaacciióónn ddeell rraacckk
Installing Flush-Mount or Center-Mount Static Rails (Two-Post)
NNOOTTEE: To configure your rails for a tooled flush-mount installation, refer to PANEL 3.
Attach right and left mounting rails to the front mounting flanges with two pairs of screws (11).
Slide each flush-mount adjustable bracket
forward against the two-post rack.
Secure each side to the mounting flange with two pairs of screws (22).
For a center-mount installation,
push the adjustable rear mounting brackets toward the back of the right and left mounting rails.
Attach the fixed center mount brackets
to the front mounting flanges with two pairs of screws.
Slide both the adjustable rear-mounting brackets forward against the two-post
rack.
Secure each side to the mounting flange with two screws (33).
Installation en position centrale des rails statiques (à deux montants)
RREEMMAARRQQUUE
Less